1915 Çanakkale Köprüsü

1915 Çanakkale Bridge

Mechanical and process installation on the crossing

Work platform on the water during construction of the 1915 Çanakkale Bridge
1915 Çanakkale Köprüsü
Scope
Mechanical and process installation
Period
2019
Structure
Suspension bridge, 2023 m main span
Discipline
Piping · Equipment · Marine works

Mechanical and process works on the 1915 Çanakkale Bridge, the longest suspension bridge in the world, carried out from marine platforms and from the tower foundations on shore.

Work on the crossing was staged from pontoons and jack-up platforms, which meant every lift, every pipe run and every connection had to be planned around marine access, weather windows and the main contractor’s own programme.

Our scope covered process and service piping with its valve groups, pumping and distribution equipment, and the mechanical installations serving the tower foundation and anchorage works.