Continuous Casting Line — United States
US facility deployment
- Location
- United States
- Scope
- Installation · Piping · Electrical
- Team
- Mech-Tech personnel
- Working
- Alongside the OEM
Deployment of Mech-Tech personnel to a facility in the United States — mechanical assembly, foundation alignment, hydraulic and cooling piping and auxiliary equipment connections.
Our teams were mobilised to the United States and worked alongside the equipment manufacturer's commissioning engineers. The scope covered mechanical assembly and foundation alignment, then the fabrication and installation of hydraulic, cooling and process piping, valve groups and equipment connections.
Pump groups, valve groups, heat exchangers and process piping were installed and connected by our own personnel. This is the deployment model we now offer across the United States: our teams, our supervision, the same standard as on a site in Türkiye.
Your next project, one team.
Share the scope of the project. We will come back to you with an engineering approach and a plan for carrying it out.
Discuss your project →